Skip to content

Operations Policy

Change Management Policy

Ensure changes to production systems are reviewed, tested, and traceable.

Summary

Policy overview

Scope

Application, infrastructure, and configuration changes affecting production.

Objectives

  • Require review before production change
  • Maintain traceability from request to deployment
  • Define emergency change handling
  • Require rollback capability

What the policy covers

  • Changes are peer reviewed before release.
  • Every deployment is traceable to an approved change.
  • Emergency changes follow an expedited but recorded path.
  • Rollback is available for production changes.

Governance

Enforced through protected branches, required checks, and deployment audit trails.

Framework references

  • NIST SP 800-171 3.4
  • CIS Controls 4

These are public governance summaries. Full policy text, operational procedures, runbooks, and configuration standards are not published and are provided under NDA or contract where a review requires them.

Related

More Operations policies

  • Logging Policy

    Ensure security-relevant events are recorded with sufficient detail for review.

  • Monitoring Policy

    Detect availability and security anomalies in a timely manner.

  • Asset Management Policy

    Maintain an accurate inventory of systems, devices, and information assets.

IEP ALLY APP LLC does not hold FedRAMP authorization, SOC 2 attestation, ISO 27001 certification, or CMMC certification. Framework references describe familiarity and practice alignment only. They do not represent certification, authorization, endorsement, audit, or verified compliance status.

Requesting security documentation?

Contracting officers, prime contractors, integrators, and auditors can request review materials through our secure documentation workflow.